With pressure from two directions - need for additional classroom space at Highland View Elementary and limited financial resources - Greendale School District got creative: Re-purpose existing space to address changing needs. Serving as the District's Owner Representative, The Peter Scherrer Group (TPSG) analyzed alternatives and presented options to the District for consideration. Following selection of a solution, TPSG conducted the selection process for the needed design and construction services. Kudos to JP Cullen and their design team member, Groth Design, for achieving the near impossible: Designing, permitting and building out the project in 6 weeks. GDS staff, lead by Brian Koffarnus, made this timetable possible.